Requirements by Wellington Shire Council based on Clause 52.32 of the Planning Scheme
|
|
Planning and technical documents |
| |
|
|
|
1. |
Site analysis and design response |
|
» Site analysis and design response. PDF (1,992 KB) |
2. |
Development plan(s) including the layout and height of the wind turbines and associated buildings and works, materials, reflexivity, colour, lighting, landscaping, connection to the electricity grid, access roads and parking areas. |
|
» Development plan. PDF (219 KB)
» Temporary site facilities. PDF (116 KB)
» Details of the construction standard for the proposed maintenance track. PDF (93 KB)
» Turbine foundations. PDF (3,190 KB)
» Access Roads for blade and tower transport. PDF (411 KB)
» Crane Shelf Area. PDF (145 KB)
» Grid connection proposal. PDF (391 KB)
» Grid connection proposal. PDF (391 KB)
|
3. |
Information about the location of the dwellings within a 500 metre radius of the site |
|
» Wind farm layout with a 500 metre offset line. PDF (320 KB) |
4. |
Calculation of greenhouse benefits |
|
» Wind energy ready reckoner. PDF (11 KB) |
5. |
Photomontages or other visual simulations illustrating the develpment from key vantage points. |
|
» Visual impact assessment. PDF (10,086 KB)
|
6. |
Assessment of the impact of the proposal on any avifauna listed under the Flora and Fauna Guarantee Act 1988 or Environment Protection and Biodiversity Conservation Act 1999. |
|
» Bird utilisation survey. PDF (357 KB)
» Bat activity report. PDF (584 KB)
» Flora and fauna assessment report. PDF (446 KB)
|
7. |
Assessment of the noise impact of the proposal based on the New Zealand Standard NZ6808:1998, Acoustics - The Assessment and Measurement of Sound from Wind Turbine Generators. |
|
» Noise assessment report. PDF (3696 KB)
|
8. |
An assessment of other potential amenity impacts such as blade glint, shadow flicker, electromagnetic interference. |
|
» Shadow flicker forecast. PDF (1,092 KB)
» Declaration of conformity. PDF (123 KB)
|
9. |
Impact upon any nearby airfields (within 30km radius) |
|
» Civil Aviation Safety Authority statement. PDF (20 KB) |
10. |
Impact upon Aboriginal culture heritage or European cultural heritage. |
|
» Culture Heritage Impact. PDF (26 KB) |
11. |
An environmental management plan, including site rehabilitation and monitoring.
|
|
» Environmental Management Plan. PDF (62 KB) |
| |
|
|
|
| Additional requirements by Wellington Shire Council |
|
Planning and technical documents |
| |
|
|
|
12. |
Results of a preliminary consultation with the residents and owners of dwellings within 500 metres of the boundaries of the subject land. |
|
» Results of a preliminary consultation. PDF (746 KB) |
13. |
Find out if the Minister requires an Environmental Effects Statement for the project and that the project is an action that is exempt from or has approval under the Environment Protection and Biodiversity Conservation Act 1999. |
|
» EES not required. PDF (132 KB) |
14. |
Landscape and visual assessment should include a determination of the visual impacts
- within a 2 km radius of the proposed wind farm, where the turbines would be prominent
- between 2 and 6 km from the site, where turbines would be visible
- between 6 and 15 km from the site, where turbines would be recognisable, sometimes not noticed
- more than 15 km from the site, where the turbines would be detectable, often not noticed
|
|
» Visual impact assessment. PDF (10,086 KB) |
| |
|
|
|
|
VCAT Application for Review P2691/2006 |
|
Planning and technical documents |
| |
|
|
|
|
Statement of evidence for visual impact assessment
prepared by Stephen Schutt
of Hansen Partnership Pty Ltd |
|
» Visual Impact Evidence. PDF (10,086 KB) |
|
Statement of evidence for Noise Impact Assessment by Timothy Michael Marks of Marshall Day Acoustics Pty Ltd |
|
» Expert Witness Statement. PDF (873 KB) |
|
Statement of planning evidence prepared by Virginia Jackson of Harlock Jackson Pty Ltd |
|