Preliminary investigations and draft layouts have been completed by Synergy Wind for two wind farm sites in the Glenelg Shire. Option to lease agreements have been signed with landowners and the development process is being initiated. A wind met mast is to be installed to verify wind data in hand.

Project size: 30 MW (Discovery Bay) and 14 - 30 MW (Bridgewater Lakes)
Measured average wind speeds on 10 metres height: 7,7 m/s;
Consequently average wind speeds at hub height (60 to 80 metrres) is above 8 m/s